About - Lilama 10 - Nghi Son 2 Project

Lilama 10 jsc on Nghi Son 2 Project. Nghi Son 2 thermal power plant is a 1,330MW coal-fired power plant planned to be built next to the existing 600MW Nghi Son 1 power plant located in the Thanh Hoa province of Northern Vietnam.

Breaking

About

About Nghi Son 2 BOT project

Nghi Son 2 thermal power plant is a 1,330MW coal-fired power plant planned to be built next to the existing 600MW Nghi Son 1 power plant located in the Thanh Hoa province of Northern Vietnam.
The new power plant will be built, owned and operated by the special purpose company, Nghi Son 2 Power Limited Liability Company (NS2PC), which is a 50:50 joint venture between Marubeni Corporation and the Korea Electric Power Corporation (KEPCO).
Estimated to cost $2.79bn, the Nghi Son 2 thermal power plant will consist of two super critical coal-fired power generating units.
Construction on the project is scheduled to begin by the end of 2018, while full commissioning is expected in July 2022.

Project name: Nghi Son 2 BOT Thermal Power Plant
Employer: Marubeni -Kepco
Main Contractor: Doosan heavy industries Vietnam
Sub Contractor: Lilama Corporation.
Area Scope of Lilama 10 Contract:  BOP Piping & Equipment

Kết quả hình ảnh cho nghi son 2 power plant


Kết quả hình ảnh cho nghi son 2 power plant

1 comment: